Simple Science

Cutting edge science explained simply

# Computer Science# Networking and Internet Architecture

Streamlining Network Delay Analysis with Saihu

Saihu simplifies the process of analyzing network delays for time-sensitive applications.

― 4 min read


Saihu: Delay AnalysisSaihu: Delay AnalysisSimplifiedefficient and user-friendly.Saihu makes network delay analysis
Table of Contents

In today's world, many systems rely on networks that need to operate smoothly and predictably. For networks that deal with time-sensitive data, such as those used in video calls or online gaming, understanding how long data will take to travel through the network is crucial. This is where delay analysis comes in, helping to ensure that delays are kept within acceptable limits. Saihu is a user-friendly tool designed to make it easier to analyze network delays.

What is Network Delay Analysis?

Network delay analysis refers to the process of figuring out how long it takes for data to travel from one point in a network to another. This is important for applications that require quick responses, such as real-time streaming or online transactions. If delays are too long, Users may experience lag or interruptions, leading to a poor experience.

Why Delay Analysis is Needed

When designing a network, it is essential to know not just how it looks but how it performs under different conditions. Various tools exist for delay analysis, but they often work in different ways. Some may provide different results for the same network, leading to confusion for researchers and engineers. This is why having a unified approach is necessary.

The Challenges with Current Tools

Traditionally, researchers have had to use different tools for analyzing delays, each demanding its own setup and programming language. This can result in a lot of repetitive work, which can lead to errors. For example, if someone wants to analyze the same network using two different tools, they would need to learn the specific commands for each tool and input the data in various formats. This can be time-consuming and frustrating.

Introducing Saihu

Saihu is a new Python interface that simplifies the delay analysis process. It combines several popular analysis tools-like xTFA, DiscoDNC, and Panco-into one easy-to-use interface. Users can define their network in a single file format (either XML or JSON) and run analyses with all three tools at once without worrying about various programming languages or syntaxes.

Features of Saihu

  1. Unified Interface: Saihu provides a single platform where users can easily define their network and run multiple analyses.

  2. Simple Syntax: The tool uses straightforward commands, making it easier to execute analyses without needing extensive programming knowledge.

  3. Automatic Result Formatting: Once analyses are complete, Saihu can generate reports automatically. Users get results in an organized format, which can simplify decision-making.

  4. Future Expansion: The design of Saihu allows for the addition of more tools in the future, providing flexibility and adaptability.

How to Use Saihu

Using Saihu is a straightforward process:

  1. Install: Users first need to install Saihu and its dependencies.

  2. Define the Network: Users can either write their network in XML or JSON format, depending on their preference.

  3. Run Analyses: With a couple of commands, users can execute analyses using different tools.

  4. View Reports: After the analysis is complete, users can view formatted reports that summarize the findings.

Example of Network Definition

When defining a network, users need to specify details about the servers, links, and flows. For instance, a network might consist of several servers (like computers or switches) that send and receive data. Each connection between servers is referred to as a link.

Here's a simple example of how a network might be defined in JSON:

{
  "name": "Demo Network",
  "servers": [
    {"name": "Server1", "latency": "10us"},
    {"name": "Server2", "latency": "20us"}
  ],
  "links": [
    {"from": "Server1", "to": "Server2", "capacity": "100Mbps"}
  ],
  "flows": [
    {"name": "Flow1", "source": "Server1", "target": "Server2"}
  ]
}

Running Analyses with Saihu

Once the network is defined, users can run analyses by simply calling a command. For example:

from interface import TSN_Analyzer

analyzer = TSN_Analyzer("network_definition.json")
analyzer.analyze_all()

In this case, the command analyze_all() will run all the included tools on the defined network.

Viewing the Results

After executing the analysis, Saihu produces reports that detail the flow of data, delays encountered, and other performance metrics. These reports can be in a human-readable format or machine-friendly format for use in other applications.

Conclusion

Saihu offers a new way to analyze network delays, making tasks easier and more efficient for researchers and engineers working with time-sensitive networks. By providing a unified interface and simplifying the process, Saihu helps to focus on essential insights rather than on the nuances of different tools.

Future of Saihu

Looking ahead, the creators of Saihu aim to continue developing this tool, integrating more analysis methods and improving the user experience. Feedback from users will play a vital role in shaping its development.

Acknowledgments

Saihu represents a collaboration among various experts in the field of network analysis. Their collective insights have guided the design and functionality of this tool, ensuring it meets the needs of today's network researchers.

Original Source

Title: Saihu: A Common Interface of Worst-Case Delay Analysis Tools for Time-Sensitive Networks

Abstract: Time-sensitive networks, as in the context of IEEE-TSN and IETF-Detnet, require bounds on worst-case delays. Various network analysis tools compute such bounds; these tools are based on different methods and provide delay bounds that are all valid but may differ; furthermore, it is generally not known which tool will provide the best bound. To obtain the best possible bound, users need to implement multiple pieces of code with a different syntax for every tool, which is impractical and error-prone. To address this issue, we present Saihu, a Python interface that integrates the three most frequently used worst-case network analysis tools: xTFA, DiscoDNC, and Panco. They altogether implement six analysis methods. Saihu provides a general interface that enables defining a network in a single file and executing all tools simultaneously without any modification. Saihu further exports analysis results as formatted reports automatically and allows quick generation of certain types of networks. With its simplified steps of execution, Saihu reduces the burden on users and makes it accessible for anyone working with time-sensitive networks.

Authors: Chun-Tso Tsai, Seyed Mohammadhossein Tabatabaee, Stéphan Plassart, Jean-Yves Le Boudec

Last Update: 2024-08-23 00:00:00

Language: English

Source URL: https://arxiv.org/abs/2303.14565

Source PDF: https://arxiv.org/pdf/2303.14565

Licence: https://creativecommons.org/licenses/by/4.0/

Changes: This summary was created with assistance from AI and may have inaccuracies. For accurate information, please refer to the original source documents linked here.

Thank you to arxiv for use of its open access interoperability.

More from authors

Similar Articles